Guide · Rented garage

A charger in a rented garage: how to reach an agreement with the owner

A guide for people who keep their car in a rented garage or garage box: how to get the owner to say “yes”, what the consent must say, who pays for what — and what happens to the equipment when you move out.

Updated 7 September 2026.8 min readConsent template · 3 sourcesAuthor: the Evolako team

Translated from Serbian. Prices, quotes from company websites and data are given in English for convenience; where the exact wording matters, the Serbian original applies.

Short answer: a rented garage is the simplest case — no residents' assembly, no vote, just one person who has to say “yes”. The owner says it once they know three things: that they will not be paying for your electricity, that nobody will put their garage at risk, and what happens to the equipment when you move out. All three are settled with one sheet of paper and one meter.

1–2 weeksrealistically, from the conversation with the owner to the first charge — the installation itself takes one day
0 RSDwhat a charger in their space costs the owner: you pay for the equipment, the installation and the electricity, by the meter
from 59.000 RSDSTART package: reinforced socket 2,3–3,7 kW, MID meter, test certificate and paperwork — works on an ordinary single-phase supply

What the garage owner actually asks

Hardly anyone says “no” to you because they dislike electric cars. They say “no” because they do not know the answer to one of these three questions — so settle them before the owner asks.

“Who pays for the electricity?” — because it goes through their meter

In a rented garage the electricity almost always goes through the owner's meter. The answer that works: a separate certified MID meter sits on the charger circuit, once a month the owner receives a statement with the reading and the amount at the price on their bill, with no markup, and the reimbursement is paid together with the rent. Without a meter, every arrangement falls apart at the first winter bill. What the billing looks like in practice.

“You won't burn my garage down, will you?” — because they have heard about extension cords

A justified fear if charging goes through an ordinary Schuko socket: at 16 A it heats up to ~100 °C within half an hour of continuous use. The answer: a dedicated circuit, type A RCD protection with DC detection, a circuit breaker, installation by a licensed electrician and a test certificate handed to the owner. That is not “a slightly better socket” — it is an installation done to code, with the paperwork to prove it. What exactly it must include.

“What stays when you leave?” — and “Will it damage my wiring?”

The equipment is yours: you can take it with you (restoring the space to its original condition), leave it by agreement or hand it over to the next tenant. For the owner, the third option is usually the most attractive — a space with a charger is easier to let to electric car drivers, and there are more of them every year. And it does not damage the wiring: the connection capacity is checked before installation, and a wallbox with dynamic load management does not trip the breakers.

What to offer the owner — a package that gets signed in ten minutes

  1. An assessment in hand, not an idea in your head Come with a concrete plan: where the power supply is, where the cable will run, how long the installation takes, who does it. When the owner sees a plan instead of an intention, the conversation comes down to the questions from the previous section.
  2. Written consent One page, an addendum to the lease agreement — the template is below. It states who pays for the work, how the electricity is metered, who is liable and what happens to the equipment at the end of the lease.
  3. MID meter and a monthly statement Every month the owner receives a document: meter reading, consumption, the price from their bill, the amount. They do not have to calculate or read anything.
  4. Test certificate after the work A copy of the authorised contractor's test certificate goes to the owner. It is their proof that the installation is in order — and your argument if it is ever needed.
  5. Agreement on the end of the lease Agree now on what happens when you move out: removal and restoration to the original condition, a buyout at an agreed price, or a handover to the next tenant. No awkward conversations later.

Template: garage owner's consent

Fill in the square brackets and attach the technical specification. The text is indicative — it serves as an addendum to the lease agreement; with our packages you receive a completed version after the assessment.

Garage owner's consent to setting up an electric vehicle charging installation

I, [full name], owner of garage / garage box no. [__] at the address [___], let to [tenant's full name] under a lease agreement dated [date], consent to the tenant setting up, at their own expense, an electric vehicle charging installation with a power of up to [__] kW, in accordance with the technical specification dated [date], which is attached to this consent, under the following conditions:

1. The work is carried out by an authorised contractor in accordance with the applicable regulations. On completion of the work, the tenant provides me with the test certificate (test report) for the installation.

2. The installation's consumption is measured by a separate MID-certified meter. The tenant reimburses me for the electricity consumed at the price on my supplier's bill, with no surcharge, on the basis of a monthly statement, [together with the rent / by day __ of each month at the latest, for the previous month].

3. The equipment remains the property of the tenant. When the lease ends, [the tenant removes the equipment and restores the installation to its original condition within __ days / the equipment stays in the garage against compensation of __ RSD / the terms will be agreed no later than 30 days before the lease ends].

4. The tenant maintains the installation at their own expense and is liable for any damage arising from its use.

In [place], on [date] · Owner: ______________ · Tenant: ______________

Who pays for what

Equipment and installationThe tenant. The kit is yours — just like a TV you bring into a rented flat.
ElectricityThe tenant, by the MID meter and at the price on the owner's bill, with no markup. The owner does not pay a single dinar for someone else's electricity.
RentBy agreement. A space with a charger may cost more — but that is an item in the rent, not an “electricity price” with a markup.
Maintenance and serviceThe tenant — with a subscription, this is done by the company that installed the kit, with a call-out within 48h. The owner has no obligations at all.

Moving out: three scenarios for the equipment

You take the kit with you. Removal, restoration to the original condition, installation at the new address. With a subscription, the company organises the move; without one — an electrician at the regular rate. You leave the kit behind. The owner buys the equipment at an agreed price or builds it into the next tenant's rent — for the owner it means a garage that is easier to let. You hand it over to the next tenant. Handover and switching the billing to the new user within 72h, with a subscription. In all three cases the equipment works with every electric car and plug-in hybrid (Type 2 standard): you change the car, not the kit.

The technical side: what if the garage only has “ordinary” power

Most older garages and garage boxes have a 16 A single-phase connection — and that is enough. The START package (a reinforced dedicated circuit, a 2,3–3,7 kW industrial socket, RCD protection, a MID meter) gives 100–180 km of range overnight, which covers a week of city driving. If the garage has three-phase power, a WALLBOX 11 kW is an option — a fully charged car in one night. If there is power but it is far from the space, the assessment shows the cable route and the price. If there is no power in the garage at all, the solution depends on the nearest connection point, and that is a matter for the assessment, not for a guide.

Renting a garage or garage box?

START from 59.000 RSD incl. VAT: circuit, socket, MID meter, test certificate and paperwork the owner signs without any fuss. Check what is possible in your garage in half a minute.

Check your garage

Frequently asked questions about rented garages

The garage is in an apartment building — is a residents' assembly decision needed too, not just the owner's consent?

If the cable to the garage passes through common parts of the building (a shared distribution board, the garage corridor, a common wall), authorisation from the residents' assembly is also needed — the owner requests it as the owner of a separate unit, and you give them the paperwork ready-made. If the garage has its own connection and the cable stays inside it, the owner's consent is enough. How the procedure with the residents' assembly works.

Can I go ahead without consent — “they don't need to know”?

No. An installation on someone else's property without consent is a problem that comes to light with the first larger bill or when you move out, and then you lose both the equipment and the lease. The consent is one page of text; owners sign it once they see the meter and the test certificate.

The owner is asking for a deposit for the installation. Is that normal?

It is reasonable if it is tied to a specific obligation — restoring the original condition when you move out — and if it is returned once the obligation is fulfilled. Write it into the consent: amount, condition, deadline.

Does the consent have to be registered anywhere?

No. The consent is an addendum to the lease agreement between you and the owner; keep a copy together with the lease, the test certificate and the monthly statements. That is all the “paperwork” there is.

What if I change my car?

Nothing — the socket and the wallbox work with every electric car and plug-in hybrid using the Type 2 standard. You change the car, not the kit.

How long does it take from agreement to the first charge?

Realistically 1–2 weeks: an assessment within 48h, the owner's consent, installation in one day, the test certificate. If a decision by the building's residents' assembly is also needed, allow 4–10 weeks.

Sources

  • Law on Obligations, provisions on lease agreements — paragraf.rs
  • Law on Housing and Building Maintenance, Article 12 (works on a separate unit and on common parts) — paragraf.rs
  • EPS household price list as of 1.10.2025 — ceneizakon.rs

Related guides

Is the owner waiting for a concrete proposal?

After the assessment you receive a technical specification and a completed consent form for the owner. Check what is possible in your garage — or write to us.

BlokVolt is an independent guide to electric cars in Serbia: companies, prices, procedures, regulations and figures — all with a source and a check date. The site is run by the team behind Evolako, which installs chargers itself; in comparisons it is marked as “our offer” and shown in the same columns as every other company.