How much a home charger costs
The device from a store, a charger with installation, and installation alone: public prices of companies in Serbia, in one place.
Translated from Serbian. Where the exact wording matters, the Serbian original applies.
Companies with a public price
All companies →29
Public price, installation included or on request

EvolakoFeatured
from 94.000 RSDWALLBOX 11 kW, with installation
- from 94.000 RSDWALLBOX 11 kWIocharger, 5 m cable104.000 with a MID meter
- 39.000 RSDSTART2,3–3,7 kW socket and MID meter
- from 115.000 RSDWallbox PlusIocharger 22 kW, set to 11 kW115.000 with a Type 2 socket127.000 with a 5 m cableMID meter +10.000
- 155.000 RSDWallbox PremiumWallbox Pulsar Max195.000 with the PowerBoost meterMID meter +10.000
- from 96.000 RSDBUILDING2–6 spaces at onceper parking space
- from 24.000 RSDInstallation onlythe customer's charger
with VAT and basic installation next to the distribution board (up to 2 m of cable, RCD and breaker); the cable to the charging spot and other work are priced at the site assessment, before any work starts
- InstallationYes
- Meter and billingYes
- Assembly paperworkTemplates
- Service and warrantyYes, optional

eDrive
570 € + VATFMT AC 7–22 kW
- 570 € + VATFMT AC 7–22 kW(≈ 80.200 RSD incl. VAT)
- on requestTeltonika 11/22 kW
- InstallationOn request
- Meter and billingNot mentioned
- Assembly paperworkNot mentioned
- Service and warrantyNot mentioned

Charge&GO / ChargeGo (MT-KOMEX)
90.000 RSDSungrow 7,4/11/22 kW, without installation
- 90.000 RSDSungrow 7,4/11/22 kW(regular 120.000)
- 72.000Smart Mini 11/22 kWwith cable / 69.000 without
- 42.000Smart Mini 7,4 kW(regular 75.000)
- InstallationOn request
- Meter and billingNot mentioned
- Assembly paperworkNot mentioned
- Service and warrantyNot mentioned

STASANET
95.000 RSD11 kW, with installation
- 95.000 RSD11 kW(regular 130.000)
- 110.00022 kW(regular 170.500)
“standard installation on the existing wiring”; additional work based on an on-site assessment; “complete installation with cabling from 150 €”
- InstallationYes
- Meter and billingNot mentioned
- Assembly paperworkNot mentioned
- Service and warrantyNot mentioned

Orion eMobility (Orion Telekom)
99.000 RSD11 kW, without installation
- 99.000 RSD11 kW5 m cable, RFID
- 119.00022 kW, 5 m cable, RFID + 4G
- 109.00022 kW with socket
- 42.300pedestal
- 42.600Type 2 cable, 7 m
- InstallationOn request
- Meter and billingNot mentioned
- Assembly paperworkNot mentioned
- Service and warrantyNot mentioned

ProVision (SMIT Media)
107.000 RSDCircontrol eHome 5 (7,4 kW)
- 107.000 RSDCircontrol eHome 5, 7,4 kW
- eNext T, eVolve Smart S — price on request
“the charger does not come with a charging cable”
- InstallationOn request
- Meter and billingNot mentioned
- Assembly paperworkNot mentioned
- Service and warrantyNot mentioned

Telefon inženjering
92.040 RSD excl. VATWallbox Pulsar Max 22 kW
- 92.040,39 RSDWallbox Pulsar Max 22 kWexcl. VAT (≈110.450 incl. VAT)
- 80.047,89Pulsar Plus 7,4 kWexcl. VAT
- 91.649,61Copper SB 22 kWexcl. VAT
- 369.622,89Alfen Eve Double Pro-lineexcl. VAT
web shop solarni-paneli.co.rs (same legal entity), 22.09.2026; no prices on elektro-punjaci.rs
- InstallationOn request
- Meter and billingNot mentioned
- Assembly paperworkNot mentioned
- Service and warrantyNot mentioned

Emobility d.o.o.
118.000 RSD + VATWallbox Pulsar Pro 22 kW
- 118.000 RSD + VATWallbox Pulsar Pro 22 kW(≈ 141.600 incl. VAT)
- 80.900 + VATIoCharger Smart AC 22 kW with cable(≈ 97.080)
- 59.100 + VATMini Smart AC 22 kW(≈ 70.920)
- 84.000 + VATPulsar Plus 22 kW(≈ 100.800; “out of stock”)
- InstallationOn request
- Meter and billingNot mentioned
- Assembly paperworkNot mentioned
- Service and warrantyNot mentioned
Device only

Qoltec (Bit Media)
39.800 RSD11 kW
- 39.800 RSD11 kW(regular 48.750)
- 42.9007 kW
- 51.40022 kW(regular 64.250)
- 67.49022 kW WiFi/LCD/RFID(regular 82.720)
- 19.800Portable 3,5 kW, 5 m(regular 24.750)
on 23.09.2026 the 11 kW and 7 kW were in stock, the rest “out of stock”
The company's website does not mention installation, a meter, assembly paperwork or a service.

Digital Hajduković
43.191 RSDWallbox 7 kW EVD02-07RD, without installation
- 43.191 RSDWallbox 7 kWEVD02-07RD(regular 47.990)
- 47.51111 kWEVD02-11RD(52.790)
- 56.15122 kWEVD02-22RD(62.390)
- 60.47122 kW SMART with WiFi appEVD02-22RW(67.190)
- 89.99022 kW M3W3 swiftWiFi
- 19.863Portable 16 AE0123016AT2C(22.070)
The company's website does not mention installation, a meter, assembly paperwork or a service.

PMP (ETEK)
43.197,72 RSD11 kW RFID
- 43.197,72 RSD11 kW RFID
- 64.294,27Smart 11 kW OCPP with a built-in MID meter
- 48.364,2222 kW RFID
- InstallationNot mentioned
- Meter and billingBuilt into the device
- Assembly paperworkNot mentioned
- Service and warrantyNot mentioned

Voltech Srbija
48.000 RSDEVX11 11 kW
- 48.000 RSDEVX11 11 kW
- 60.000Gemini 11 kW
- 68.000Honor11 + DLB
- 38.000EVX07 7,4 kW
- 55.000–80.00022 kW
- 70.000BENY 22 kW OCPP
the same prices also on eponuda.com
The company's website does not mention installation, a meter, assembly paperwork or a service.

WISE Smart Home
62.890 RSDWSCP08 7 kW
- 62.890 RSDWSCP08 7 kW
- 67.390–82.390WSCP02
- 62.390–72.390WSCP07
- 21.690–52.990portable 3,5–7 kW
The company's website does not mention installation, a meter, assembly paperwork or a service.

SP Solar
70.092 RSDSungrow 11 kW
- 70.092 RSDSungrow AC011E-01, 11 kW
the same model costs 90.000 at ChargeGo
The company's website does not mention installation, a meter, assembly paperwork or a service.

Andreja d.o.o. (solar-shop.rs)
72.000 RSDGrowatt THOR 22 kW
- 72.000 RSDGrowatt THOR 22 kW(was 118.800)
- 101.880Growatt THOR 11 kW
- 76.800Victron 22 kW
- 118.800Huawei SCharger 22 kW(out of stock)
The company's website does not mention installation, a meter, assembly paperwork or a service.

Sirotin Šabac
72.000 RSDMorek 11 kW with cable, without installation
- 72.000 RSDMorek 11 kW, display, LAN, WiFi, RFID, cable 6,5 mMEV11DREWN6T2
- 81.600Morek 22 kW, smartMEV22DREWN6T2
- 60.000Morek 11 kW, portableMEV11DNNNN5T2
in stock
The company's website does not mention installation, a meter, assembly paperwork or a service.

Tehnodućan
76.483 RSDABB Terra AC 22 kW, without installation
- 76.483 RSDABB Terra AC 22 kW, RFID, 4GW22-T-R-C-0(regular 95.604 — discount for online purchases only)
- 103.892ABB Terra AC 7,4 kW, RFIDW7-T-R-0
- 53.367Type 2 – Type 2 cable, 7 m, 32 A
- 3.410RFID cards, 5 pcs
22 kW and 7,4 kW in stock
The company's website does not mention installation, a meter, assembly paperwork or a service.

Jakov Sistem
78.820 RSDABB Terra AC 22 kW, without installation
- 78.820 RSDABB Terra AC 22 kW, cable, RFID, 4GW22-T-R-C-0(regular 119.710)
- 85.650ABB Terra AC 7 kWW7-T-R-0(130.090)
- 97.250Telwin Mastercharge 370, 230 V
- 101.170Telwin Mastercharge Flex 22
- 116.610Telwin Mastercharge 740 Connect
- 158.790Telwin Mastercharge 2200 Connect, 400 V
- 57.470ABB pedestalTAC Pedestal BTB
- 2.970ABB RFID cards
The company's website does not mention installation, a meter, assembly paperwork or a service.

Schrack Technik Srbija
82.460 RSDi-CHARGE CION Home 22 kW, without installation
- 82.460 RSDi-CHARGE CION Home 22 kW, Type 2 cable 4,7 m, no network connectivity
- price not showni-CHARGE CION Semipublic 22 kW with RFID cards
the store also caters to companies
The company's website does not mention installation, a meter, assembly paperwork or a service.

Bazzar (marketplace)
88.690 RSDUnion EVC04-AC7SWDA, without installation
- 88.690 RSDUnion EV charger EVC04-AC7SWDA
- 275.559ABB Terra AC 22 kW, 3P 32 A, Type 2 socket, RFID + 4G
- 9.561Gembird Type 2 cable, 3,7 kW, 8 m
- 4.145adapter
- cable holders 503 and 915
The company's website does not mention installation, a meter, assembly paperwork or a service.

Elmaks
93.120 RSDSchneider Charge 7,4/11/22 kW
- 93.120 RSDSchneider Charge 7,4/11/22 kW
- 97.920Schneider Charge 11 kW with 7 m cable
- 120.360EVlink Home 11 kW
The company's website does not mention installation, a meter, assembly paperwork or a service.

IT-Home
93.600 RSDTeltoCharge 11 kW
- 93.600 RSDTeltoCharge 11 kW
- 128.700TeltoCharge 22 kW
The company's website does not mention installation, a meter, assembly paperwork or a service.

Elektronapon
97.977 RSDABB Terra AC 7 kW
- 97.977 RSDABB Terra AC W7, 7 kW(81.647,50 excl. VAT)
- 111.972ABB Terra AC W22, 22 kW
7 kW “currently out of stock”, 22 kW to order; no cable
The company's website does not mention installation, a meter, assembly paperwork or a service.

Stamteh
98.166,99 RSDPulsar Plus 7,4 kW
- 98.166,99 RSDPulsar Plus 7,4 kW
- 110.293,99Pulsar Max 22 kW
- 112.393,99Copper SB 22 kW
no 11 kW version on offer
The company's website does not mention installation, a meter, assembly paperwork or a service.

Praktiker (elektrowebshop.rs)
99.990 RSDNoark 22 kW
- 99.990 RSDNoark 22 kW
- 22.999Noark electricity metering equipment
The company's website does not mention installation, a meter, assembly paperwork or a service.

Elektro Centar Nais
120.360 RSDEVlink Home 11 kW
- 120.360 RSDEVlink Home 11 kWsocket
- 110.9203,7 kW
- 114.4607,4 kW
- 125.080–141.600with 5 m cable
- 21.240–22.080load-shedder
The company's website does not mention installation, a meter, assembly paperwork or a service.

Elektroleum
150.000 RSDSchneider Electric 22 kW, without installation
- 150.000 RSDSchneider Electric wallbox 22 kW, RFID/NFCEVB3S22N41
- 232.000Schneider Electric wallbox 22 kW, RFID/NFCEVB3I22NC0M
no installation. The website's “chargers for electric vehicles” category contains e-scooter chargers — the wallbox can be found via search
The company's website does not mention installation, a meter, assembly paperwork or a service.

EP Solutions (Electro Pneumatic Solutions)
157.028 RSDEVlink Wallbox 11 kW
- 157.028,40 RSDEVlink Wallbox 11 kW
“out of stock” on the day of the check
The company's website does not mention installation, a meter, assembly paperwork or a service.
Electricians: installation only

Električar Niš
12.000–20.000 RSDinstallation
Does not sell devicesinstalls the charger the customer brings
- InstallationYes — public price
- Meter and billingNot mentioned
- Assembly paperworkNot mentioned
- Service and warrantyNot mentioned
No companies match this selection.
Questions
What does the installation price include?
A dedicated line from the distribution board to the charger, a circuit breaker and RCD protection (type A with 6 mA DC detection in the charger, or type B), the electrician's work and measurement of the installation with a test certificate. “Standard installation” usually means a short run to the board; a longer cable, digging or a new board are paid for separately.
How much does installation alone cost?
An electrician from Niš publishes 12.000–20.000 RSD for installation. PupinEnergy's guide gives a typical 15.000–35.000 RSD, and STASANET gives cabling “from 150 €”. The price depends most on the length of the cable to the board.
Why are prices so different?
Companies include different things in the price: some only the device, some the device with installation, a few also the meter and the test certificate. Some prices are without VAT or in euros. An 11 kW device with an app and a European brand costs more than a basic one, and the power (7,4, 11 or 22 kW) changes the price less than the brand does.
What should you ask before accepting a quote?
- Whether the price includes VAT and what exactly “standard installation” covers.
- Which protection is installed and whether you get a test certificate.
- Who meters the electricity if you charge in a building or in someone else's garage (who pays for electricity).
- How long the warranty is on the device, and how long on the work.
How to read the list
Prices are copied from the companies' websites, with the check date on each company's page. The lowest published price is shown. Companies without a public price are on the companies page. Prices of the devices alone, by model: wallbox models.
Sources (9)
- evolako.rs/paketi-i-cene — 28.10.2026
- evolako.rs/cesta-pitanja — 28.10.2026
- evolako.rs/llms.txt — 28.10.2026
- pupinenergy.com — 07.09.2026
- punjac.rs — prices — 06.10.2026
- punjac.rs/cena-ugradnje-ev-punjaca — 06.10.2026
- punjac.rs/kucni-punjac-za-elektricni-auto — 06.10.2026
- www.niselektricar.rs/cenovnik — 22.09.2026
- www.niselektricar.rs — 22.09.2026
Checked 22.09.2026 · Report an error