Putevi Srbije

Putevi Srbije: chargers on the motorways

State-owned fast chargers at motorway toll plazas and rest areas. Charging is free for now.

Translated from Serbian. Where the exact wording matters, the Serbian original applies.

Price36 chargers, 27 working · freeFree until billing is regulated.
Network36 chargers, 27 working
PowerDC 40–120 kW
PaymentActivation in the Orion eMobility app
AppOrion eMobility

Recorded prices

Charger · locationPriceWhen
All locationsFree (0 RSD)23.09.2026
putevi-srbije.rs

The price the app shows before charging starts is the one that applies.

Chargers and status

LocationDirection · power · status
Subotica toll plaza A1
  • Subotica–Belgrade · DC 50 kW, AC 44 kW · working
Stara Pazova toll plaza A1
  • Subotica–Belgrade · DC 75 kW, AC 22 kW · working
Belgrade toll plaza A1
  • Belgrade–Niš · DC 75 kW, AC 22 kW · working
  • Niš–Belgrade · DC 75 kW, AC 22 kW · not working
Jerina rest area A1
  • Belgrade–Niš · DC 75 kW, AC 22 kW · working
Former Niš toll plaza A1
  • Belgrade–Niš · DC 120 kW · working (up to 60 kW)
  • Niš–Belgrade · DC 120 kW · not working
Preševo toll plaza A1
  • Preševo–Niš · DC 40 kW · working
Korbevac rest area A1
  • Niš–Preševo · DC 75 kW · being connected (by the end of September 2026)
Boljkovci rest area A2
  • Belgrade–Čačak · DC 40 kW · working
Lalinci rest area A2
  • Čačak–Belgrade · DC 75 kW, AC 22 kW · working
Šid toll plaza A3
  • Šid–Belgrade · DC 50 kW · not working
  • Šid–Belgrade · DC 75 kW, AC 22 kW · working
Šimanovci toll plaza A3
  • Belgrade–Šid · DC 75 kW, AC 22 kW · working (DC connector only)
Toplik rest area A4
  • Niš–Dimitrovgrad · DC 75 kW, AC 22 kW · working
  • Dimitrovgrad–Niš · DC 75 kW, AC 22 kW · working
Dimitrovgrad toll plaza A4
  • Dimitrovgrad–Niš · DC 50 kW · not working
Ćićevac toll plaza A5
  • Pojate–Kruševac · DC 120 kW, AC 22 kW · working
Kruševac East toll plaza A5
  • Pojate–Kruševac · DC 120 kW, AC 22 kW · working
  • Pojate–Kruševac · DC 120 kW, AC 22 kW · working
Kruševac West toll plaza A5
  • Pojate–Kruševac · DC 120 kW, AC 22 kW · working
  • Pojate–Kruševac · DC 120 kW, AC 22 kW · working
Koševi toll plaza A5
  • Pojate–Kruševac · DC 120 kW, AC 22 kW · working
Trstenik toll plaza A5
  • Pojate–Trstenik · DC 120 kW, AC 22 kW · working
  • Pojate–Trstenik · DC 120 kW, AC 22 kW · working
Vrnjačka Banja toll plaza A5
  • Pojate–Vrnjačka Banja · DC 120 kW, AC 22 kW · working
  • Pojate–Vrnjačka Banja · DC 120 kW, AC 22 kW · working
Adrani toll plaza A5
  • DC 120 kW · being connected (by the end of the year)
  • DC 120 kW · being connected (by the end of the year)
Preljina toll plaza A5
  • DC 120 kW · being connected (by the end of the year)
  • DC 120 kW · being connected (by the end of the year)
Ruma toll plaza A8
  • Belgrade–Ruma · DC 120 kW, AC 22 kW · working
  • Belgrade–Ruma · DC 120 kW, AC 22 kW · working
Hrtkovci toll plaza A8
  • Belgrade–Šabac · DC 120 kW, AC 22 kW · working
Šabac toll plaza A8
  • Belgrade–Šabac · DC 120 kW, AC 22 kW · working
  • Belgrade–Šabac · DC 120 kW, AC 22 kW · working

According to the list of JP "Putevi Srbije" of 28.10.2026. Planned on new sections: 3 more.

How to charge

  1. Charging is started in the Orion eMobility app (an account with an e-mail address and a card): scan the QR code on the charger or use an RFID card.
  2. At AC chargers you need your own cable, unless it says otherwise on the charger; DC chargers have a cable attached.
Payment
Charging is free for now.

App: Orion eMobility — Google Play · App Store

Checked 06.10.2026 · sources: putevi-srbije.rs. The same instructions are also on each charger's card on the map.

Billing and fees

Free — “charging electric vehicles at the existing chargers is currently free of charge” (website); regulations for introducing billing are being prepared (B92, 19.06.2026).

No fees. No published limit on session length.

Network, roaming and support

Network: 36 chargers: 27 working, 4 currently out of service, 5 being connected; 3 more planned on new sections (JP "Putevi Srbije" list, checked 28.10.2026)

Payment: Activation through the Orion eMobility app (no charge)

App: Orion eMobility; the chargers are also visible in Plug&Share, Virta and Google Maps

Power: DC 40–120 kW; AC 22 kW at most locations too (Subotica AC 44 kW)

Coverage: motorways A1, A2, A3, A4, A5 and A8

Support: 011 4100 333 (technical support, Orion Telekom's number)

See also free chargers.

Sources (3)

Checked 28.10.2026 · Report an error

Do you run this network? Send the details